Lock a schedule
- (If it is not open already) Open an existing schedule.
-
Click the Other tab.
-
Click Record Lock Status.
The Record Lock Status dialog box appears.
-
Select or clear Lock Record to indicate the locked status of the schedule.
Locked Date/Time and Locked By automatically populate with values.
-
Click OK.
In the Schedule dialog box, a check appears in the check box in the Completed column next to Record Lock Status to indicate that the record is locked.
- In the Schedule dialog box, click Close.